Trollbrucke – Foundations

map16-0330draft

This is mostly done now.  There are a few final touches that need to be added in, and the upper layers haven’t been drawn, yet.  But this gives a pretty good sense of where I’m headed with this project.

I thought the idea was pretty great, although mostly just a throwaway, initially.  But I’ve spent too much time fussing over it, and I think it’s lost some of the original energy.

There is already a section above this, which is well underway, with the surface and the actual bridge itself.  By implication, there could be a couple more sections, with the two ends of the bridge off to either side.  There are also at least two more implied underground sections, with the tunnel leading off to the right and the stairway leading even deeper.  Those may remain unknown, though.  Too many things I don’t like in this, although it was fun to try.

Advertisements

Tags: , , , , , , ,

One Response to “Trollbrucke – Foundations”

  1. Final Trollbrucke | Antherwyck House Games Blog Says:

    […] I’d previously posted a mostly complete draft of this, but I couldn’t find it (just this mostly finished lower half).  That just makes this a better reveal now.  There are a couple other works-in-progress that I […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: